Item Type: Album
Document Tags
Add- Rongotai Aerodrome
- Lagoon in Evans Bay
- Watford Street 1956
- Wexford Road
- Rongotai Terrace (upper path)
- Installation of conveyor belt for reclamation
- Reclamation of Evans Bay (I)
- 114 Rongotai Terrace
- Removal of Wexford Road
- Garage on Rongotai Terrace
- Empty lots on Rongotai Terrace
- 90 Rongotai Terrace
- Removal of 90 Rongotai Terrace
- Reclamation for Airport runway
- Gaudin Street 1955
- Gaudin Street 1957
- Rongotai Terrace
- 18 Rongotai Terrace
- Conveyor belt moving soil
- Aberdeen Quay (Cobham Drive) II
- Excavations in Rongotai
- Aberdeen Quay (Cobham Drive) III
- Coutts Street
- Houses on Coutts Street
- Unoccupied houses for demolition
- Reclamation for Airport runway (I)
- Wilkins & Davies Construction
- Rongotai Road 1956
- Cars passing over conveyor belt
- Excavations above Aberdeen Quay
- Evans Bay reclamation
- Excavation above Aberdeen Quay
- Traffic control on Aberdeen Quay
- Soil removal for airport development
- Excavations above Miramar Wharf
- Residents watching the reclamation of Evans Bay
- Dumping soil in Evans Bay
- Conveyor belt (Airport reclamation)
- Relocation of soil into Evans Bay
- National Film Unit cameraman
- Reclamation of Evans Bay (II)
- Reclamation of Evans Bay (III)
- Evans Bay reclamation works (II)
- Evans Bay reclamation progress
- Demolition of 38 Rongotai Terrace
- Rongotai Terrace after removal of houses
- Demolition of houses, Rongotai Terrace
- Relocation of 22 Wexford Road
- Wexford Road from Tirangi Road
- Rongotai Road
- Evans Bay reclamation (I)
- Creation of Airport runway
- New lanes for Calabar Road
- Excavations in Rongotai (II)
- Reclamation of Evans Bay (IV)
- Reclaimed land in Evans Bay
- Boom conveyor
- Erasure of Rongotai Terrace
- Evans Bay reclamation works (I)
- Construction of pedestrian subway
- 94 - 96 Wexford Road
- Airport development project
- Excavation of Wexford Road
- Excavation of Wexford Road (I)
- Evans Bay reclamation (II)
- Evans Bay during reclamation
- Rongotai Terrace hill (I)
- Former Rongotai Aerodrome
- Watford Street 1957
- Removal of houses on Coutts Street
- Removal of Wexford Road (I)
- Evans Bay and Rongotai
- Demolition of Electrolux Factory
- Removal of Rongotai Terrace
- Reclaimed land, Kilbirnie
- Earthworks for Airport development
- Wexford Road (I)
- Closure of Wexford Road
- Earthworks for Airport runway (I)
- Removal of Wexford Road (II)
- Construction of Airport runway
- Wellington Airport runway 1958
- Aerial photograph of Rongotai
- Aerial photograph of Wellington Airport development
Linked To
Collection
Copyright
This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 3.0 New Zealand LicenseThis licence allows you to download this work and share it with others as long as you mention us and link back to us, but you cannot change it in any way or use it commercially.
OCR | |
![]() | [...]SKETCH OF the interior of the pedestrian and cycle subway under the Rongotai runway. [ = i Se[...] |
![]() | [...]tai INAL approval for plans for a pedestrian and cycle subway underneath the new Rongotai airport[...] |
![]() | [...]ciliate the consiruction of | the Couts s Street cycle, pedesirian and. | Subiway - coanection Wi[...] |
![]() | [...]he position of the third-completed pedestrian and cycle subway which will run under the runway. 10[...] |
![]() | [...]. A City Council traffic officer provided a motor-cycle escort for the convoy. The crane, having c[...] |
![]() | [...]destrian ay 1, complete losure. Pedestrian and cycle traffic. will then use the subway constru[...] |
![]() | [...]e Open Early Next Month The 800ft pedestrian and cycle subway beneath the new runway ongotai, linking C[...]a quick Tink across | the aerodrome for foot and cycle traffic. E Target date for the completion[...] |
![]() | [...]e on the east end of the new 800ft pedestrian and cycle subway expected to be opened at Rongotai i[...] |
![]() | [...]the Mt. Victoria Traffic just their speed to the cycle and | Tunnel. Trolleys were slowed by craw[...] |
![]() | Afoot, On Cycle, New Subway | - Dodges Runway Pedestrians and cy[...]MIRO STREET approach to the new 800ft pedestrian cycle subway linking the two portions of Rongota[...] |
![]() | [...]ll on Coutts Street and around the pedestrian and cycle | subway. The one-sixth of a mile section of Cou[...]| Approaches at either end of the pedestrian and cycle subway have been completed and the gub- M[...] |
Click on the image to add
a tag or press ESC to cancel
a tag or press ESC to cancel
Ron Cameron, Wellington Airport Development: Book Two . Wellington City Libraries, accessed 29/03/2026, https://wellington.recollect.co.nz/nodes/view/11677