Open/Close Toolbox
Item Type: Pamphlets & Ephemera
Linked To
Copyright
Crown Copyright
You may use use, copy, share and reproduce pages from this work on a non-commercial basis. You must include a credit and reference to the original source, all Crown information must be accurately reproduced and you must not use the material in a manner that is offensive, deceptive or misleading. You cannot alter or remix the work.
OCR | |
![]() | WELLINGTON URBAN MOTORWAY NGAURANGA-AOTEA QUAY SECTION STAGE ONE |
![]() | [...]ust a quarter of a mile short of three miles, the Ngauranga-Aotea Quay sec- tion, planned toopen to traffic i[...]“= COVER: View of Motorway looking South from Ngauranga. PHOTO: Evening Post. |
![]() | [...]- Column detail. Future Motorway Interchange at Ngauranga. |
![]() | FACTS AND FIGURES DIMENSIONS — Ngauranga-Aotea Quay ramp, 2.7 miles, includes half a mile[...]lf from borrow area above Hutt Road and half from Ngauranga Gorge. Contractor for reclamation, Earthmovers (Waikato[...]lt by Fletcher Construction Co, Ltd, in 1964-65, Ngauranga Railway Bridge - Sixty feet long, one hundred fee[...]Built by Williams Construction Co. Ltd. in 1966, Ngauranga Culvert and Overpass — Culvert, three hu[...] |
MD | |
| [...]e public. Stage one would connect traffic between Ngauranga and Aotea Quay and aimed to reduce the hea[...] | |
| Ngauranga | |
Wellington Urban Motorway: Stage One. Wellington City Libraries, accessed 25/05/2026, https://wellington.recollect.co.nz/nodes/view/9151





